Cable testing is continuing. The cables between the power distro boxes and main panel have been installed and the cabling between the main panel and UPSs has also been installed. Fire suppression install is going well.
- Fire supression system cabling
- UPS install
- Main PDU distro cables
- Main Panel cabling
- Panels for the fire supression