M247 Ltd Manchester Datacentre Build Blog

Progress 2nd Feb

by jon on Feb.02, 2009, under Build Progress

Cable testing is continuing. The cables between the power distro boxes and main panel have been installed and the cabling between the main panel and UPSs has also been installed. Fire suppression install is going well.