Archive for January, 2012
Building work progress – 20/1/12
by Phil Evans on Jan.22, 2012, under Build Progress, DC2 build
The first stages of the building of the new floor are now taking place. The RSJs are in place ready to support the concrete floor. The buildings are now fully knocked through upstairs as well.
- Recess for the bottom of the lift
- A bit of a drop…
- The RSJs for the main structure of the floor
- Buildings now knocked through upstairs
- RSJs in place
- Didn’t there used to be a door there?…
Building work progress – 11/1/12
by Phil Evans on Jan.11, 2012, under Build Progress, DC2 build
The building work is progressing well. The staircase has now been removed ready for the new floor to be put in. The doorway has also been knocked through downstairs to join the two buildings.
- Some photos from before the staircase removal
- Structure supporting the stairs while they are removed
- Bit by bit the concrete is removed
- A bit more progress
- Staircase now fully removed
- Anybody have a ladder?…
- Progress being made on knocking through the two buildings
- Buildings knocked through downstairs