Building work progress – 20/1/12
by Phil on Jan.22, 2012, under Build Progress, DC2 build
The first stages of the building of the new floor are now taking place. The RSJs are in place ready to support the concrete floor. The buildings are now fully knocked through upstairs as well.
- Recess for the bottom of the lift
- A bit of a drop…
- The RSJs for the main structure of the floor
- Buildings now knocked through upstairs
- RSJs in place
- Didn’t there used to be a door there?…