Progress 12 Feb 09
by Daniel B on Feb.12, 2009, under Build Progress
The main board is up and running, the generator is cabled and due to be commisioned tomorrow.
The plaster upstairs is drying nicely and should be painted early next next week.
- The PDU’s being finished yesterday
- Some of the plastering being done upstairs
- Some of the plastering being done upstairs
- More electrics
- Pretty lights on the main board
- PDU output readings
- Incoming power readings
- The generator wired up
- The generator wired up
- The data floor looking good
- Don’t the racks look pretty
- What a lot of battery boxes
Progress 10 Feb 09
by Daniel B on Feb.10, 2009, under Build Progress
More progress has been made on the little details, including the lines of racks shaping up nicely and last of the plaster boarding is going up upstairs.
The most important change today is this one though. The main board is in place!
- Main board in position
- Close up of the board
Progress 09 Feb 09
by Daniel B on Feb.10, 2009, under Build Progress
Not much chatter tonight, just some pictures
- Partitioning
- Walls to go up
- Walls to go up
- Partioning
- Almost done
- Partitioning
- Lighting being redivided
- Partitions coming along
- Our kitchen is almost done
- Our kitchen is almost done
- Preparing for the big panel
- Earthing
- A row of racks
- A row of racks
- Working on the security systems
- Working on the earthing
- Drilling a hole
- Drilling a hole
- Drilling a hole
- Corridor
Progress 05 Feb 09
by Daniel B on Feb.05, 2009, under Build Progress
A short update and some pictures…
Progress is continuing with wiring the power system.
The fire suppression system is progressing nicely.
The first of our external cameras is up and running.
- Top PDUs
- Bottom PDUs
- Fire suppression system
- Fire suppression system
- Generator fuel tank
- Camera housing
- Awesome camera
Progress 21 Jan 09
by Daniel B on Jan.22, 2009, under Build Progress
Please stop hurting me, I know it’s late. I’m sorry. Please stop the pain.
Lets see… they dug a hole across the road, put in a cable, and filled it in again.
Jon unpacked and started assembling the expensive router.
Matt started terminating the office cables.
David and Matt unpacked the servers and made a biiiiig pile of packaging.
Downstairs, they put most of the floor in (and by the look of it, they’ve almost completed it now) and they also started wiring the breakers.
Off camera, they dug a very long trench in the soil to run the cable round.
*throws the pictures at the mob and goes to find somewhere to hide*
- There’s a hole in my road…
- And it’s long and thin.
- But it’s ok, they’re filling it in
- With a digger!
- I hope he remembers to get out of that hole…
- Now they’re both in the hole!
- Oooh, hole go bye bye
- So they’re making another one
- The boss unpacking.
- Yes, that’s copper cable labeled fragile
- The boss inspecting the expensive box
- The boss opening the expensive box
- The boss filling the box. Note the hard hat.
- Matt busy fiddling with plugs
- And this is what happens when you unpack a pile of servers.
- And we have a floor!
- Well, almost…
- Oh my! They wired the breakers!
Progress 18 Jan 09
by Daniel B on Jan.18, 2009, under Build Progress
Well technically it’s mostly the progress from the 17th, but I’ve been spying on the workmen so I can give sneak previews of what will be seen in the next lot of pictures.
Upstairs we have started putting in the office network, running the longest of the runs of cable, ready for termination once the walls are up.
The cabling should be finished and hidden again in a few days.
We have a happy, humming server recording an image of the progress every 5 seconds, which provides us with some excellent material to do some fun things with later.
We have also been busy, the past few days, testing out some of the new equipment that will be going on the data floor.
You may also be able to make out, on that last picture, the lights of the new power bar on the floor. The power bar, that is. On the floor. Not lights removed from the power bar, cause that would be bad.
Downstairs, the plastered walls are drying out nicely… much more interesting than watching paint dry.
The supports for the suspended data trays have been going up.
More wires have been run for the power sockets.
The busy workers have even started fitting the cover for the power runs.
My spying shows that they’re just about done for today.
The first data tray has been put up … ironically, just in front of the camera.
More of the power runs have been covered.
And I think I caught a glimpse of sockets being wired.
And now it’s time for some pictures of Saturday’s work.
For pictures of today’s, you’ll have to tune in tomorrow.
Same place, but probably different time. If you’re really eager, why not subscribe to the RSS feed, so you’ll know when the next wonderful pictures go up?
- The first delivery of servers
- The destination of our upstairs cabling
- A very long hole
- Turns a corner…
- Not so long hole
- Half done and hidden
- Half to go
- The fruits of our labour, and it’s purple!
- Wall drying nicely
- Even more cables!
- Running this way
- First row
- Second row
- Third row
- Fourth row
- Fifth row
- So many wires…
- Long view
- Tray supports
- Close up tray support
- Other side tray supports
Progress 16 Jan 09
by Daniel B on Jan.16, 2009, under Build Progress
Another day of lovely progress…
Our first shipment of servers arrived in a big truck. Thank heavens for the lift.
The second ducting has started going in on the other side of the road and runs half the length, hopefully that section will be done in another day’s work.
The plasterers have been busy, and the new walls around the UPS room have been plastered on both sides and are looking good.
The power sockets have started being run, and I’m glad I don’t have to make sense of that collection of wires.
Off camera, cable trays running power above the suspended ceiling have been going in (loudly) and cabling has started for the office.
Hopefully come the end of Monday we can bring you pictures of the office framework going up. Fingers crossed.
And now, the pictures.
- Two nice men and their truck
- More purple, on the other side this time.
- The UPS room wall is plastered
- Oh my, what a lot of wires
- The wires are running away
- End of the line for the wires
Progress 15 Jan 09
by Daniel B on Jan.15, 2009, under Build Progress
Much progress is afoot.
The first ducting trench now reaches the length of the road.
The prep work for building the offices upstairs has now begun.
The camera is back in place downstair *cough* and we will hopefully be able to bring you some cool pictures from that in the next few days.
The holes for the cooling in pipes are drilled, the rest of the sockets are in, and the first three electrical boxes are up on the wall.
The UPS room wall is up… and the phone line is in! Internet to follow soon.