27th May – Photos of our Colocation Facilities
by chrisbyrd on May.27, 2009, under Facility Information
As part of their case study, our UPS manufacturer sent a photographer to take some pictures of our completed datacentre. See below for the results
- Main Entrance Area
- Main Entrance
- Half-Megawatt diesel generators
- Generator & Diesel Tank
- DX Condensors
- Generator and cable connections
- Half-Megawatt Diesel Generator
- UPS Modules
- UPS Module
- UPS Module
- UPS Modules
- 100KVA UPS Module
- UPS Panel
- Inside Contained ‘cold-aisle’
- SuperMicro Serves
- Geoff Garside
- Geoff Garside
- Rack containing Dell PowerEdge Servers
- Main Data Area
- Colocation Racks
- Chris Byrd
Progress 4th February
by tomh on Feb.04, 2009, under Build Progress
Today we have had some very significant deliveries to the datacentre. We have had the generator delivered at the exact same time we had gas cylinders delivered and a bit later on, half of our racks were delivered. We have had a lot of progess with our fibre connectivity, we should have that live very shortly. We have had people splicing today with the fibre. We also had the office people in today who continued their work on the development of the office partitions upstairs, they haven’t been able to access the site recently due to weather restrictions. Today, we had one of our newly delivered network cameras configured which you can see below along with plenty of other pictures from todays events.
- First signs of the generator
- Gas cylinders
- Generator entering the site
- Generator
- Generator becomes airborne with crane
- Lining the generator up
- Generator in position
- Gas cylinder
- Racks being delivered
- Workers moving the racks into the datacenter
- Switch, Network Camera and an Wireless Access Point
- Racks in the DC
- Close up on three racks
- Splicing fibre
Progress 3rd Feb
by Mat Buckle on Feb.04, 2009, under Build Progress
Today we had one of the major step forwards in intruder protection with the start of the installation of the windows bars. As you can see they are pretty well re-inforced. We have had a lot of electricians in working with the switch board and the power distribution unit. They’re currently glanding from the main board around the datacenter. We had an arrival of our wireless access points, we were the last delivery of the day! More deliverys today, quite importantly the generator will be arriving, the picture below shows the spot waiting for it.
- All those plants went into Dave’s Mercedes!!
- A squeeze
- Fire alarm
- cables coming from switch board into UPS room
- Burglar guards and the UPS
- Burglar Bars
- Fire Alarm
- Power
- Cables from Generator
- Fire Protection
- Connecting up
- Power Sockets
- Cables from Generator
- The over head racks finished
- Concrete Prepared for the generator