Tag: Photos
27th May – Photos of our Colocation Facilities
by chrisbyrd on May.27, 2009, under Facility Information
As part of their case study, our UPS manufacturer sent a photographer to take some pictures of our completed datacentre. See below for the results
- Main Entrance Area
- Main Entrance
- Half-Megawatt diesel generators
- Generator & Diesel Tank
- DX Condensors
- Generator and cable connections
- Half-Megawatt Diesel Generator
- UPS Modules
- UPS Module
- UPS Module
- UPS Modules
- 100KVA UPS Module
- UPS Panel
- Inside Contained ‘cold-aisle’
- SuperMicro Serves
- Geoff Garside
- Geoff Garside
- Rack containing Dell PowerEdge Servers
- Main Data Area
- Colocation Racks
- Chris Byrd




















